Indikator Pembentuk Kinerja Operasi, Manajemen Mutu Terpadu, Manajemen Risiko dan Keunggulan Bersaing pada Proyek Konstruksi

Authors

  • Primanda Adi Wibowo Institut Teknologi Sepuluh Nopember
  • I Putu Artama Wiguna Institut Teknologi Sepuluh Nopember

DOI:

https://doi.org/10.59603/ppiman.v4i4.1452

Keywords:

Competitive Advantages, Cost, Quality, Risk Management, Time, Total Quality Management

Abstract

Operational performance is a primary indicator of construction project success, reflected through cost, quality, and time performance achievements. However, complexity and uncertainty in the construction industry cause companies to face challenges in maintaining continuous overall performance consistency. Therefore, strengthening organizational capabilities through Total Quality Management (TQM), Risk Management, and Competitive Advantage is necessary as a strategic approach to improve process effectiveness, control risks, and create added value for construction companies. This research aims to identify and evaluate indicators forming the constructs of Operational Performance, Total Quality Management (TQM), Risk Management, and Competitive Advantage in active construction projects. The study uses a quantitative approach with Confirmatory Factor Analysis (CFA) to confirm reflective indicators' ability to properly represent each construct. Research data were obtained through questionnaire distribution to managers at State-Owned Enterprise contractors. Analysis was conducted based on loading factor values to determine each indicator's contribution level in forming the research construct. Results show that indicators used possess good representation capability for measured constructs. In Total Quality Management (TQM), Customer Focus is the dominant indicator with a loading factor of 0.903. Next, Buyer-Supplier Relationship (0.893) is the most representative indicator forming Competitive Advantage, while Risk Response Development (0.965) is dominant in Risk Management. Operational performance regarding Project Cost Performance is most dominantly indicated by Cost Efficiency (0.799), followed by documentation and reporting (0.867) in Project Quality Performance and NC/Rework Completion Duration in Project Time Performance. These research findings contribute key indicators to guide construction companies in setting operational performance improvement priorities.

References

Ahmed, M., & Sajid, N. (2023). Leadership and Its Impact on Total Quality Management. Journal of Advanced Research in Economics and Administrative Sciences. https://doi.org/10.47631/jareas.v4i3.709

Ansari, M., Abouraia, M., & Morsy, T. (2024). Influence of transformational and transactional leadership on agile project success. Project Leadership and Society, 5, 100136. https://doi.org/10.1016/j.plas.2024.100136

Baird, K., Hu, K. J., & Reeve, R. (2011). The relationships between organizational culture, total quality management practices and operational performance. International Journal of Operations and Production Management, 31(7), 789–814. https://doi.org/10.1108/01443571111144850

Bytyçi, I., Qerimi, A., Qerimi, F. (2023). The Impact Of Total Quality Management On Operational Performance. Journal of Governance and Regulation (2023) 12(1) 171-184. https://doi.org/10.22495/jgrv12i1art16

Carvalho, M., & Junior, R. (2015). Impact of risk management on project performance: The importance of soft skills. International Journal of Production Research. https://doi.org/10.1080/00207543.2014.919423

Dering, N. Z. (1998). Leadership in quality organizations. The Journal for Quality & Participation. Volume 21, Issue 1.

Hussein, A. R., & Moradinia, S. F. (2023). Mitigating Time and Cost Overruns in Construction Projects: A Questionnaire Study on Integrating Earned Value Management and Risk Management. Journal of Studies in Science and Engineering, 3(2), 37–51. https://doi.org/10.53898/josse2023323

Hwang, B.-G., Thomas, S., & Haas, C. (2009). Measuring the Impact of Rework on Construction Cost Performance. Journal of Construction Engineering and Management, 135. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)

Kurniady, D. A., Nurochim, Komariah, A., Turwelis, Hoi, H. T., & Ca, V. H. (2022). Construction project progress evaluation using a quantitative approach by considering time, cost and quality. International Journal of Industrial Engineering and Management, 13(1), 49–57. https://doi.org/10.24867/IJIEM-2022-1-300

Lepistö, K., Saunila, M., & Ukko, J. (2022). Facilitating SMEs’ profitability through total quality management: The roles of risk management, digitalization, stakeholder management and system deployment. The TQM Journal, 34(6), 1572–1599. https://doi.org/10.1108/TQM-07-2021-0204

Lussier, R. N., & Achua, C. F. (2021). Leadership: Theory, Application, & Skill Development (7th ed.). Cengage Learning.

Mohamed, A. G., Ammar, M. H., & Nabawy, M. (2022). Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. The International Journal of Construction Management, 1–12. https://doi.org/10.1080/15623599.2022.2092387

Polat, G. (2010). Using ANP priorities by targeting the optimal delivery of marketing resources. Innovation in Construction, 10(3), 346–365.

Potter, E. M., Egbelakin, T., Phipps, R., Balaei, B. (2018). Emotional intelligence and transformational leadership behaviours of construction project managers. Journal of Financial Management of Property and Construction. https://doi.org/10.1108/JFMPC-01-2017-0004

Raz, T., Shenhar, A. J., & Dvir, D. (2002). Risk management, project success, and technological uncertainty. R&D Management, 32(2), 101–109. https://doi.org/10.1111/1467-9310.00243

Rodríguez-Rivero, R., Ortiz-Marcos, I., Romero, J., & Ballesteros-Sánchez, L. (2020). Finding the Links between Risk Management and Project Success: Evidence from International Development Projects in Colombia. Sustainability, 12(21), 9294. https://doi.org/10.3390/su12219294

Riaz, H., Khan, K. I. A., Ullah, F., Tahir, M. B., Alqurashi, M., & Alsulasi, B. (2023). Key factors for implementation of total quality management in construction sector: A system dynamics approach. Ain Shams Engineering Journal, 14, 101903. https://doi.org/10.1016/j.asej.2022.101903

Sharma, S., & Modgil, S. (2020). TQM, SCM and operational performance: An empirical study of Indian pharmaceutical industry. Business Process Management Journal, 26(1), 331–370. https://doi.org/10.1108/BPMJ-01-2018-0005

Susanty, A., Puspitasari, D., & Aisyah, S. (2011). Analisis hubungan kepemimpinan transformasional terhadap TQM, komitmen organisasi dan kinerja karyawan. Jurnal J@TI Undip.

Downloads

Published

2026-10-01

How to Cite

Primanda Adi Wibowo, & I Putu Artama Wiguna. (2026). Indikator Pembentuk Kinerja Operasi, Manajemen Mutu Terpadu, Manajemen Risiko dan Keunggulan Bersaing pada Proyek Konstruksi. PPIMAN Pusat Publikasi Ilmu Manajemen, 4(4), 01–16. https://doi.org/10.59603/ppiman.v4i4.1452